Turnkey Projects & Validation

Turnkey Projects & Validation

What are Turnkey Projects & Validation?

Most cleanroom and hospital infrastructure projects fail not because a single component was wrong, but because components weren't coordinated, a panel system installed before HVAC ductwork was finalised, or a room built to a classification the validation testing later shows it doesn't meet. A turnkey approach closes that gap, treating the project as one coordinated build from design through commissioning rather than a sequence of separately managed trades.

Skan Inc undertakes turnkey pharmaceutical cleanroom, modular OT, and hospital infrastructure projects, drawing on the panel, HVAC, door, and equipment capabilities covered elsewhere on this site and coordinating them into a single project timeline. Where a project needs expertise or components outside our direct manufacturing scope, we work with established partners and take responsibility for how those pieces integrate into the finished facility.

Purpose-Built Solutions in this Category

Select a tab below to explore the available products

Project Solutions

Coordinated turnkey delivery brings cleanroom, modular OT, laboratory, and hospital infrastructure systems together around one performance target and one project timeline.

Turnkey Pharma Cleanroom Projects

Turnkey Pharma Cleanroom Projects

A turnkey pharmaceutical cleanroom project starts from the classification the space needs to hold, whether an ISO 14644 class or GMP grade, and works backward to the panel specification, HVAC capacity, utilities, and layout. Civil work, panel installation, HVAC integration, and utilities are planned against the same classification target from the outset rather than allowing each trade to work from separate assumptions.

Modular Operation Theatre Turnkey Setup

Modular Operation Theatre Turnkey Setup

A modular operation theatre turnkey setup brings together panels and flooring, hermetically sealed doors, HVAC and laminar airflow, OT equipment and control panels, and medical gas outlets in one room designed around the surgical workflow. It is delivered as one coordinated build because a modular OT rarely performs as intended when these systems are assembled without considering how they interact.

BSL-2 / BSL-3 Laboratory Infrastructure

BSL-2 / BSL-3 Laboratory Infrastructure

Biosafety-level laboratories are built around containment, not just cleanliness. The correct infrastructure is selected against the risk of the biological agents involved and the facility-specific containment standard, with BSL-3 environments requiring considerably more demanding engineering controls than a standard pharmaceutical cleanroom.

BSL-2 and BSL-3 at a Glance

Level Containment Approach Typical Requirement
BSL-2 Standard microbiological practice plus some engineering controls Moderate-risk biological agents
BSL-3 Directional airflow from low to high risk, sealed penetrations, and often dedicated exhaust filtration Considerably more demanding than a standard pharma cleanroom and planned around the facility's specific containment standard
IVF Lab Controlled Environments

IVF Lab Controlled Environments

IVF laboratory controlled environments account for embryo sensitivity to air quality, temperature stability, and volatile organic compound levels beyond standard cleanroom particle counts. They are built with tighter VOC filtration and environmental stability control than a general pharmaceutical cleanroom.

CSSD

CSSD

A Central Sterile Services Department handles the receiving, cleaning, sterilisation, and storage of surgical instruments for an entire hospital. Its layout follows a strict one-directional flow from dirty to clean to sterile storage so instruments never move backward through a completed stage. A poorly planned flow creates cross-contamination risk regardless of the quality of the sterilisation equipment.

Validation & Services

Commissioning, qualification, periodic testing, and scheduled maintenance demonstrate that a critical facility was built correctly and continues to perform within its intended operating limits.

DQ / IQ / OQ / PQ Documentation Services

DQ, IQ, OQ, and PQ form the standard validation lifecycle a pharmaceutical cleanroom or critical facility follows before approval for use. Documentation through each stage is what a regulatory inspection or internal quality audit reviews, so the paperwork matters as much as the physical testing behind it.

The Validation Lifecycle at a Glance

Stage Confirms
DQ — Design Qualification The design meets the intended requirement before construction begins
IQ — Installation Qualification The installed system matches the approved design
OQ — Operational Qualification The system operates correctly across its intended range
PQ — Performance Qualification The system performs consistently under real operating conditions

HEPA Filter Integrity Testing (DOP)

HEPA filter integrity testing is commonly called DOP testing after the dispersed oil particulate method historically used. A generated aerosol is introduced upstream of the filter and downstream air is scanned for particle concentration above the allowed threshold, indicating a breach in the filter media or a gap at the frame seal. Testing is repeated at defined intervals throughout a cleanroom's operational life because filter integrity degrades over time.

Particle Count Mapping & Air Velocity Tests

Particle count mapping measures airborne particle concentration at multiple points to confirm that the room meets its intended ISO or GMP classification. Air velocity testing checks whether airflow at HEPA filter faces or within a laminar flow zone falls inside the design range. Both are performed at commissioning and repeated periodically because a room can drift out of classification over time without an obvious change in use.

AMC (Annual Maintenance Contracts)

Annual maintenance contracts cover scheduled servicing, filter changes, damper checks, AHU servicing, and periodic testing rather than reactive repair after failure. Cleanrooms and OTs degrade quietly, and airflow, pressure, or filtration problems are not always obvious in daily use, which makes scheduled maintenance especially important in critical facilities.

Frequently Asked Questions

BSL-2 relies on standard microbiological practice with some engineering controls and is suited to moderate-risk agents. BSL-3 adds directional airflow, sealed penetrations, and typically dedicated exhaust filtration, making it a considerably more demanding containment standard planned around the specific facility requirement.

It is the four-stage validation lifecycle—design, installation, operational, and performance qualification—that a pharmaceutical cleanroom or critical facility goes through before approval. Each stage's documentation is what a regulatory inspection or quality audit actually reviews.

It is a HEPA filter integrity test that introduces a generated aerosol upstream and scans downstream air for any leak point in the filter media or at the frame seal. It is repeated periodically through a cleanroom's operational life, not just once at commissioning.

Yes. Commissioning confirms the room meets classification on day one. Airflow, pressure, and filtration performance can drift afterward without any visible sign, which is what scheduled maintenance under an AMC is built to catch before it becomes a compliance issue.